Monitoring and Control Technology for Blasting Vibration of the Double-arch Tunnel without Middle Drift in Red-bed Soft Rock
(1 Constructing Headquarters of the Yunnan Chuxiong-Dayao Expressway,Chuxiong 650228; 2 Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092;3 Department of Geotechnical Engineering,Tongji University,Shanghai 200092)
Download: PDF (2905KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Construction without middle drift is a novel method for the double-arch tunnel, and the blasting excava? tion of the subsequent tunnel will have a vibration impact on the lining structure of the antecedent tunnel. Taking the Chenjiachong tunnel of Chuxiong-Dayao expressway in Yunnan province as an example, it studies the blasting vibration control technology of double-arch tunnel without middle drift in red-bed soft rock. Firstly, the three main influence factors of the double-arch tunnel blasting are analysed: the distance between blasting sources, the explosive charge and stress release. Then automatic vibration monitoring is carried out in the corresponding area of the antecedent tunnel aiming at the three-bench、excavation and two-bench excavation of the subsequent tunnel, and the blasting vibration law of the V-level surrounding rock of the red-bed soft rock is obtained by regression analysis of the monitoring data, the explosive dosage of cutting hole, the numbers of nonel detonator segment and economic energy unloading holes as well as the hole spacing are obtained by back analysis,a layout of the blast holes and blasting scheme are established to meet the needs of the site. The field monitoring data show that the revised critical value of vibration velocity and the optimized blasting scheme meet the safety requirements and guarantee the smooth excavation of the subsequent tunnel and no vibration induced cracking in the concrete secondary lining.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
QIAN Zhengfu1 XU Jinfeng2
3 ZHOU Yingxin1
2
3 ZHOU Biao2
3 XIE Xiongyao2
3
KeywordsRed-bed soft rock   Double-arch tunnel without middle drift   Blasting   Interaction   Automated monitoring   Vibration control.     
Abstract: Construction without middle drift is a novel method for the double-arch tunnel, and the blasting excava? tion of the subsequent tunnel will have a vibration impact on the lining structure of the antecedent tunnel. Taking the Chenjiachong tunnel of Chuxiong-Dayao expressway in Yunnan province as an example, it studies the blasting vibration control technology of double-arch tunnel without middle drift in red-bed soft rock. Firstly, the three main influence factors of the double-arch tunnel blasting are analysed: the distance between blasting sources, the explosive charge and stress release. Then automatic vibration monitoring is carried out in the corresponding area of the antecedent tunnel aiming at the three-bench、excavation and two-bench excavation of the subsequent tunnel, and the blasting vibration law of the V-level surrounding rock of the red-bed soft rock is obtained by regression analysis of the monitoring data, the explosive dosage of cutting hole, the numbers of nonel detonator segment and economic energy unloading holes as well as the hole spacing are obtained by back analysis,a layout of the blast holes and blasting scheme are established to meet the needs of the site. The field monitoring data show that the revised critical value of vibration velocity and the optimized blasting scheme meet the safety requirements and guarantee the smooth excavation of the subsequent tunnel and no vibration induced cracking in the concrete secondary lining.
KeywordsRed-bed soft rock,   Double-arch tunnel without middle drift,   Blasting,   Interaction,   Automated monitoring,   Vibration control.     
Cite this article:   
QIAN Zhengfu1 XU Jinfeng2, 3 ZHOU Yingxin1, 2 etc .Monitoring and Control Technology for Blasting Vibration of the Double-arch Tunnel without Middle Drift in Red-bed Soft Rock[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(3): 167-174
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I3/167
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY