Monitoring and Control Technology for Blasting Vibration of the Double-arch Tunnel without Middle Drift in Red-bed Soft Rock
(1 Constructing Headquarters of the Yunnan Chuxiong-Dayao Expressway,Chuxiong 650228; 2 Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092;3 Department of Geotechnical Engineering,Tongji University,Shanghai 200092)
Download: PDF (2905KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Construction without middle drift is a novel method for the double-arch tunnel, and the blasting excava? tion of the subsequent tunnel will have a vibration impact on the lining structure of the antecedent tunnel. Taking the Chenjiachong tunnel of Chuxiong-Dayao expressway in Yunnan province as an example, it studies the blasting vibration control technology of double-arch tunnel without middle drift in red-bed soft rock. Firstly, the three main influence factors of the double-arch tunnel blasting are analysed: the distance between blasting sources, the explosive charge and stress release. Then automatic vibration monitoring is carried out in the corresponding area of the antecedent tunnel aiming at the three-bench、excavation and two-bench excavation of the subsequent tunnel, and the blasting vibration law of the V-level surrounding rock of the red-bed soft rock is obtained by regression analysis of the monitoring data, the explosive dosage of cutting hole, the numbers of nonel detonator segment and economic energy unloading holes as well as the hole spacing are obtained by back analysis,a layout of the blast holes and blasting scheme are established to meet the needs of the site. The field monitoring data show that the revised critical value of vibration velocity and the optimized blasting scheme meet the safety requirements and guarantee the smooth excavation of the subsequent tunnel and no vibration induced cracking in the concrete secondary lining.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
QIAN Zhengfu1 XU Jinfeng2
3 ZHOU Yingxin1
2
3 ZHOU Biao2
3 XIE Xiongyao2
3
KeywordsRed-bed soft rock   Double-arch tunnel without middle drift   Blasting   Interaction   Automated monitoring   Vibration control.     
Abstract: Construction without middle drift is a novel method for the double-arch tunnel, and the blasting excava? tion of the subsequent tunnel will have a vibration impact on the lining structure of the antecedent tunnel. Taking the Chenjiachong tunnel of Chuxiong-Dayao expressway in Yunnan province as an example, it studies the blasting vibration control technology of double-arch tunnel without middle drift in red-bed soft rock. Firstly, the three main influence factors of the double-arch tunnel blasting are analysed: the distance between blasting sources, the explosive charge and stress release. Then automatic vibration monitoring is carried out in the corresponding area of the antecedent tunnel aiming at the three-bench、excavation and two-bench excavation of the subsequent tunnel, and the blasting vibration law of the V-level surrounding rock of the red-bed soft rock is obtained by regression analysis of the monitoring data, the explosive dosage of cutting hole, the numbers of nonel detonator segment and economic energy unloading holes as well as the hole spacing are obtained by back analysis,a layout of the blast holes and blasting scheme are established to meet the needs of the site. The field monitoring data show that the revised critical value of vibration velocity and the optimized blasting scheme meet the safety requirements and guarantee the smooth excavation of the subsequent tunnel and no vibration induced cracking in the concrete secondary lining.
KeywordsRed-bed soft rock,   Double-arch tunnel without middle drift,   Blasting,   Interaction,   Automated monitoring,   Vibration control.     
Cite this article:   
QIAN Zhengfu1 XU Jinfeng2, 3 ZHOU Yingxin1, 2 etc .Monitoring and Control Technology for Blasting Vibration of the Double-arch Tunnel without Middle Drift in Red-bed Soft Rock[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(3): 167-174
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I3/167
 
No references of article
[1] MA Hui1 GAO Mingzhong2.Discussion on the Construction Management of Sichuan-Tibet Railway Tunnel Based on System Engineering Methodology[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 1-8
[2] WANG Mingnian1,2 GUO Xiaohan1,2 YU Li1,2 LI Chunhui1,2 CHEN Shuwang3.Study on the Location Selection of Emergency Rescue Station of the Extra-long Railway Tunnel at High Altitude[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 9-14
[3] LI Chang1,2 WANG Gang1,2 QIU Wenge1,2,3 GONG Lun1,2 ZHAO Yingchun4 WANG Qiuhui4.Research and Application of Support Resistant Limiting Dampers in the Tunnel with High Horizontal Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 15-29
[4] LIAO Jun1 DONG Qian1 LIANG Hongyong2 JIAN Bo2 SHI Yuchuan1,3 GONG Hongwei1.Preliminary Study on the Classification Indexes of Surrounding Rock for the Highway Tunnel in Nearly Horizontal Red-bed Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 25-29
[5] LU Song1,2 WANG Xu1,2 LI Cangsong1,2 MENG Lu1,2.Study on Geological Prediction Technology of HSP Method for TBM Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 30-35
[6] ZHONG Zuliang1,2 GAO Guofu1, 2 CHEN Peng1 YAN Ru1.Discussion on Design for the Liangjiang Ship Sightseeing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 36-42
[7] HUANG Fujie HE Zegan ZHANG Weimin LIU Shanshan.Application Research of BIM Technology in Engineering Design of the Immersed Tube Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 43-48
[8] TANG Xiaosong1, 2 ZHENG Yingren3 WANG Yongfu1.Application of FEM Strength Reduction Method in Stability Analysis and Control of Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 49-55
[9] WU Bo1,2 LAN Yangbin1,2 YANG Shisheng1,2 YANG Jianxin3 PANG Xiaoyu3.Study on Stability of Surrounding Rock Based on Strength Reduction Dynamic Analysis Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 56-64
[10] ZHOU Cuiying1,2 LI Ang2,3 LIU Zhen1,2.Study on the Influence of Parallel Fold Structure on Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 65-74
[11] MA Li1 LIU Yapeng2 LI Sheng3,4 LV Wenda5 XIE Chao3,4 DAI Jinpeng3,4.Study on the Mechanical Behaviors of High-filled Loess Arched Open Cut Tunnel under Different Load Reduction Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 75-84
[12] ZHANG Bingwu1 ZHANG Peng1 DAI Zhenhua2 WU Yinghe2 LUO Wei2.Analysis of the Mechanical Behavior of Segments of the Shield-driven Metro Tunnel beneath River Bottom[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 85-90
[13] SUI Xin1 ZHANG Zhengwei1 MING Xuan2 DOWNIE Steven3 PADHANI Shahid3 ZHAO Libo4.Numerical Simulation Analysis of SF6 Gas Leakage in Extra-Long GIL Utility Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 91-98
[14] ZHANG Kefeng.Numerical Simulation of Water Burst in Roadway Excavation with Karst Cave Ahead[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 99-107
[15] ZHANG Yan1, 2 WANG Wei2 DENG Xueqin2.Prediction Model of TBM Advance Rate Based on Relevance Vector Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 108-114
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY