|
2020, Vol. 57(5): 10-22 DOI: | ||
Risk Evaluation of the Tunnel Passing through Active Fault Zone and Engineering Application | ||
(1 China Highway Engineering Consultants Corporation, Beijing 100089; 2 Beijing No.3 Municipal Construction Engineering Co., Ltd,Beijing 100022) | ||
Received null Revised null | ||
Supporting info | ||
|