现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2020, Vol. 57(5): 177-183    DOI:
Aseismic Performance-based Optimal Analysis on the Installation Location of Directly Buried Gas Pipeline beyond the Utility Tunnel
(1 Shenzhen Government Investment Project Evaluation Center, Shenzhen 518035; 2 Harbin Institute of Technology (Shenzhen) ,Shenzhen 518055)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn