|
2020, Vol. 57(5): 177-183 DOI: | ||
Aseismic Performance-based Optimal Analysis on the Installation Location of Directly Buried Gas Pipeline beyond the Utility Tunnel | ||
(1 Shenzhen Government Investment Project Evaluation Center, Shenzhen 518035; 2 Harbin Institute of Technology (Shenzhen) ,Shenzhen 518055) | ||
Received null Revised null | ||
Supporting info | ||
|