现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2020, Vol. 57(6): 86-92    DOI:
Calculation Method and Engineering Application of Drawdown Induced by Tunnel Water Leakage
ZHENG Bangyou1 LIU Jiyao2,3 LEI Mingfeng2,3 LU Zhiqiang1 WU Zhigang1 PENG Cheng1(1 China Construction Tunnel Corp., Ltd., Chongqing 401320;2 School of Civil Engineering, Central South University, Changsha 410075;3 MOE Key Laboratory of Engineering Structures of Heavy Haul Railway, Changsha 410075)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn