现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2020, Vol. 57(6): 149-153    DOI:
Analysis and Treatment of Blind Pipe Blockage in Humaling Tunnel on Lanzhou-Chongqing Railway
(1 China Railway Lanzhou Group Co., Ltd., Lanzhou 730000; 2 School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou,730070)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn