|
2020, Vol. 57(6): 149-153 DOI: | ||
Analysis and Treatment of Blind Pipe Blockage in Humaling Tunnel on Lanzhou-Chongqing Railway | ||
(1 China Railway Lanzhou Group Co., Ltd., Lanzhou 730000; 2 School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou,730070) | ||
Received null Revised null | ||
Supporting info | ||
|