现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2021, Vol. 58(3): 205-215    DOI:
Study on the Reasonable Excavation Option of "Tunnel First before Shaft" for an Running Tunnel of Xi′an Metro Line 9
(1 Institute of Geotechnical Engineering, Xi′an University of Technology, Xi′an 710048; 2 China Railway City Development and Investment Group Co., Ltd., Xi′an 710013)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn