Study on the Reasonable Excavation Option of "Tunnel First before Shaft" for an Running Tunnel of Xi′an Metro Line 9
(1 Institute of Geotechnical Engineering, Xi′an University of Technology, Xi′an 710048; 2 China Railway City Development and Investment Group Co., Ltd., Xi′an 710013)
Download: PDF (6967KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The difficulty for the "tunnel first before shaft" construction method is the construction of the cross pas? sage of the air shaft through the existing shield tunnel segments. It′ s extremely important to choose the appropriate number of excavation benches, bench spacing and breaking method of the segments for the stability of the excavation face, the safety of the adjacent shield tunnel segments and the control of the ground settlement. This paper takes a running tunnel of Xi′an Metro Line 9 as the engineering background, establishes a 3D finite element model for the construction method of "tunnel first before shaft", and carries out tracking simulation of shield tunnelling process and inverse analysis of ground parameters based on the measured ground settlement. The results show that it is quite reasonable to adopt the bench construction method with reserved core soil to excavate the cross passage, in which the number of excavation benches is recommended to be 4 and the bench spacing is recommended to be 3 m. When the cross passage is excavated through the existing shield tunnel segments, the segments on both sides of the junction with the cross passage should be broken first before the segments in the middle, and the joint bolts between the segments in the affected area should be loosened before breaking the segments, so as to reduce the longitudinal and circumferential failures of the segments.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHU Caihui1 LAN Kaijiang1 DUAN Yu1 HE Hong2 DENG Guohua1
2
Keywords"Tunnel first before shaft"   construction method   Shield tunnel segment   Excavation method   Ground settlement   Mechanical response     
Abstract: The difficulty for the "tunnel first before shaft" construction method is the construction of the cross pas? sage of the air shaft through the existing shield tunnel segments. It′ s extremely important to choose the appropriate number of excavation benches, bench spacing and breaking method of the segments for the stability of the excavation face, the safety of the adjacent shield tunnel segments and the control of the ground settlement. This paper takes a running tunnel of Xi′an Metro Line 9 as the engineering background, establishes a 3D finite element model for the construction method of "tunnel first before shaft", and carries out tracking simulation of shield tunnelling process and inverse analysis of ground parameters based on the measured ground settlement. The results show that it is quite reasonable to adopt the bench construction method with reserved core soil to excavate the cross passage, in which the number of excavation benches is recommended to be 4 and the bench spacing is recommended to be 3 m. When the cross passage is excavated through the existing shield tunnel segments, the segments on both sides of the junction with the cross passage should be broken first before the segments in the middle, and the joint bolts between the segments in the affected area should be loosened before breaking the segments, so as to reduce the longitudinal and circumferential failures of the segments.
Keywords"Tunnel first before shaft",   construction method,   Shield tunnel segment,   Excavation method,   Ground settlement,   Mechanical response     
Cite this article:   
ZHU Caihui1 LAN Kaijiang1 DUAN Yu1 HE Hong2 DENG Guohua1, 2 .Study on the Reasonable Excavation Option of "Tunnel First before Shaft" for an Running Tunnel of Xi′an Metro Line 9[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(3): 205-215
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I3/205
 
No references of article
[1] .[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 1-5
[2] ZHU Weibin1,2 ZHONG Changping3 MI Jinsheng1 HUANG Weiran4.Challenges and Prospects of Construction Technology for Extra-large Diameter Composite Shields[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 6-16
[3] MA Shiqiang.Dialectical Thinking on Solving Major Issues in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 17-22
[4] ZHANG Jie1 LI Wei1 LI Limin2 WAN Jiwei3 DING Weihua4 JIA Chao1.Influence of Tectonic Characteristics of Surrounding Rocks on Engineering Geology of Water Conveyance Tunnel in the Hanjiang-to-Weihe River Valley Water Diversion Project[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 23-32
[5] HAN Xingbo1,2 ZHAO Weifeng1.Study on the Tunnel Lining Cracking Patterns and Failure Ranges under Fire Scenarios[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 33-42
[6] GAO Lei BAO Xueying LI Aichun.DSR-Cloud Model Based Evaluation of Construction Safety of Tunnels with High Geotemperature[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 43-51
[7] DENG Haiming1 YANG Xi2 LI Zhishan3 LEI Hongxian4 TANG Kan1 FAN Mingwai2 ZHANG Hantao2.A 3D GPR Imaging Technique of Tunnel Cavities Based on the Half-space Scanning Measurement Mode[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 52-59
[8] HE Lili.Implementation and Application of Tension-Shear Fracture of Anchor Bolts in FLAC3D[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 60-69
[9] ZHANG Xiaojian1 LIANG Bo1,2 ZHONG Shengming1,3.Study on the Influence of Environmental Factors on the Brightness Value L20(S) outside Highway Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 70-78
[10] ZHANG Chang′an1 QI Xiangcheng2.Solutions to the Spherical Cavity Grouting Pressure in Circular Tunnels Based on the Generalized SMP Strength Criterion[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 79-83
[11] YAO Yuxiang1 LI Sheng1 MA Li1 WANG Changdan2 ZUO Di3.DEM Analysis on Soil Arching Effect of Unloading Structure of High-Filled Open Cut Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 84-93
[12] HAN Guoqiang1 ZHOU Peng1 LI Sheng1 HE Chuan2 MA Li1.Research on the Calculation Method of Vertical Soil Pressure on High-Filled Open Cut Tunnels Based on Multi-factor Coupling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 94-99
[13] GAN Xingqiu1 XU Feng1 WANG Xiaowei1 LI Pei1 PENG Shuquan2 QI Binxi2 FAN Ling2 WANG Fan2.Simulation Study on Seismic Response Laws and Seismic Mitigation Measures of Tunnels under Fault Dislocation[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 100-106
[14] YUAN Bin1 XU Fanxian2 LIAO Huan3 ZHONG Yutian3 LUO Gang3.Study on the Influence of the Spatial Combination Relationship of Structural Planes on the Stability of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 107-114
[15] AN Yonglin1 LI Jiahao1 OUYANG Pengbo2 LIU Wenjuan1 SU Guangming3 ZHOU Jian3.Theoretical Analysis of the Stability of Tunnel Face under Pipe Roof Presupport[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 115-122
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY