Study on the Reasonable Excavation Option of "Tunnel First before Shaft" for an Running Tunnel of Xi′an Metro Line 9
(1 Institute of Geotechnical Engineering, Xi′an University of Technology, Xi′an 710048; 2 China Railway City Development and Investment Group Co., Ltd., Xi′an 710013)
Download: PDF (6967KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The difficulty for the "tunnel first before shaft" construction method is the construction of the cross pas? sage of the air shaft through the existing shield tunnel segments. It′ s extremely important to choose the appropriate number of excavation benches, bench spacing and breaking method of the segments for the stability of the excavation face, the safety of the adjacent shield tunnel segments and the control of the ground settlement. This paper takes a running tunnel of Xi′an Metro Line 9 as the engineering background, establishes a 3D finite element model for the construction method of "tunnel first before shaft", and carries out tracking simulation of shield tunnelling process and inverse analysis of ground parameters based on the measured ground settlement. The results show that it is quite reasonable to adopt the bench construction method with reserved core soil to excavate the cross passage, in which the number of excavation benches is recommended to be 4 and the bench spacing is recommended to be 3 m. When the cross passage is excavated through the existing shield tunnel segments, the segments on both sides of the junction with the cross passage should be broken first before the segments in the middle, and the joint bolts between the segments in the affected area should be loosened before breaking the segments, so as to reduce the longitudinal and circumferential failures of the segments.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHU Caihui1 LAN Kaijiang1 DUAN Yu1 HE Hong2 DENG Guohua1
2
Keywords"Tunnel first before shaft"   construction method   Shield tunnel segment   Excavation method   Ground settlement   Mechanical response     
Abstract: The difficulty for the "tunnel first before shaft" construction method is the construction of the cross pas? sage of the air shaft through the existing shield tunnel segments. It′ s extremely important to choose the appropriate number of excavation benches, bench spacing and breaking method of the segments for the stability of the excavation face, the safety of the adjacent shield tunnel segments and the control of the ground settlement. This paper takes a running tunnel of Xi′an Metro Line 9 as the engineering background, establishes a 3D finite element model for the construction method of "tunnel first before shaft", and carries out tracking simulation of shield tunnelling process and inverse analysis of ground parameters based on the measured ground settlement. The results show that it is quite reasonable to adopt the bench construction method with reserved core soil to excavate the cross passage, in which the number of excavation benches is recommended to be 4 and the bench spacing is recommended to be 3 m. When the cross passage is excavated through the existing shield tunnel segments, the segments on both sides of the junction with the cross passage should be broken first before the segments in the middle, and the joint bolts between the segments in the affected area should be loosened before breaking the segments, so as to reduce the longitudinal and circumferential failures of the segments.
Keywords"Tunnel first before shaft",   construction method,   Shield tunnel segment,   Excavation method,   Ground settlement,   Mechanical response     
Cite this article:   
ZHU Caihui1 LAN Kaijiang1 DUAN Yu1 HE Hong2 DENG Guohua1, 2 .Study on the Reasonable Excavation Option of "Tunnel First before Shaft" for an Running Tunnel of Xi′an Metro Line 9[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(3): 205-215
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I3/205
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY