|
2021, Vol. 58(5): 37-45 DOI: | ||
tudy on the Control Measures against Ground Settlement Induced by Shield Tunnel Construction underneath Railway Throat in Sandy Cobble Stratum | ||
(Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031) | ||
Received null Revised null | ||
Supporting info | ||
|