|
2023, Vol. 60(3): 259-265 DOI: | ||
Study on the Construction Equipment Configuration Scheme for Tunnelling under High Altitude, Low Oxygen Content and Low Atmospheric Pressure Conditions | ||
(China Railway First Group Fourth Engineering Co., Ltd., Xianyang 712000) | ||
Received null Revised null | ||
Supporting info | ||
|