|
2023, Vol. 60(6): 246-254 DOI: | ||
Study on the Ambient Temperature Control Technology for Construction of a Tunnel Near Heat-conducting Fault and with High Rock Temperature | ||
(1. School of Civil Engineering, North China University of Technology, Beijing 100144; 2. School of Civil Engineering, Beijing Jiaotong University, Beijing 100044; 3. Road and Bridge Engineering Department of Hebei Jiaotong Vocational & Technical College,Shijiazhuang 050035; 4. China Railway 16th Bureau Group 4th Engineering Co., Ltd., Beijing 101400) | ||
Received null Revised null | ||
Supporting info | ||
|