|
2024, Vol. 61(5): 1-9 DOI: | ||
Design and Application of a Prefabricated Loading Platform for Full-scale Shield Tunnel Test | ||
(1. China Academy of Railway Sciences(Shenzhen)Research and Design Institute, Shenzhen 518000; 2. College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518000; 3. Underground Polis Academy, Shenzhen University,Shenzhen 518000) | ||
Received null Revised null | ||
Supporting info | ||
|