|
2025, Vol. 62(2): 254-264 DOI: | ||
Study on the Water Leakage and Emergency Treatment in the Foundation Pit Retaining Structure in Sandy Composite Strata | ||
(1.China Railway 18th Bureau Group Municipal Engineering Co., Tianjin 300222; 2.China Railway 18th Bureau Group Corporation Limited, Tianjin 300222; 3.School of Civil Engineering, Central South University, Changsha 410075; 4.Hunan Kexin Electric Power Design Institute, Changsha 410007; 5.Key Laboratory of Heavy-haul Railway Engineering Structure, Ministry of Education,Central South University, Changsha 410075) | ||
Received null Revised null | ||
Supporting info | ||
|