|
2011, Vol. 48(5): 154-158 DOI: | ||
Application of Advanced Geological Forecast to the Qingyun Tunnel on the Xiangtang-Putian Railway | ||
(Consulting & Supervision Liability Co., Ltd. of China Railway No.1 Survey and Design Research Insitute, Xi'an 7100043) | ||
Received null Revised null | ||
Supporting info | ||
|