|
| 2011, Vol. 48(6): 94-98 DOI: | ||
| Study of In-situ Monitoring of a Shallow-Buried Hydraulic Tunnel in Loose Ground | ||
| (1 Beijing Institute of Water, Beijing 100048; 2 Beijing Key Laboratory of Urban Oil and Gas Distribution Technology, China University of Petroleum, Beijing 102249) | ||
| Received null Revised null | ||
| Supporting info | ||
|