|
2011, Vol. 48(6): 110-116 DOI: | ||
Parallel Tunnels Separated by a Thin Pillar: Construction Technology, Numerical Simulation and Monitoring Analysis of Surface Settlement | ||
(No.6 Engineering Co., Ltd. of China Railway No.17 Construction Bureau, Xiamen 361000, China) | ||
Received null Revised null | ||
Supporting info | ||
|