现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2012, Vol. 49(3): 146-153    DOI:
Comparison of Roof Brushing Construction Schemes for the Horizontal Adit and Main Tunnel of the Jieling Tunnel on the Yiba Expressway
1 Construction Headquarters of Yiba Expressway Directorate, Yichang 443700 2 China Railway 12th Bureau Group Co., Ltd, Yichang 443700
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn