现代隧道技术
Home
|
About Journal
|
Editorial Board
|
|
Instruction
|
Subscription
|
Advertisement
|
|
Download
|
中文
Office Online
Search
Adv Search
2012, Vol. 49(5): 117-122 DOI:
Key Techniques for the Pretreatment of Boulder Blasting in an Under-Sea Shield-Driven Tunnel
1 China Railway Tunnel Group Co., Ltd 2 China Railway Tunnel Co., Ltd
Received
null
Revised
null
Supporting info
Copyright © 2011 Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:
Beijing Magtech Co.ltd
Email:
support@magtech.com.cn