现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2012, Vol. 49(5): 117-122    DOI:
Key Techniques for the Pretreatment of Boulder Blasting in an Under-Sea Shield-Driven Tunnel
1 China Railway Tunnel Group Co., Ltd 2 China Railway Tunnel Co., Ltd
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn