|
2012, Vol. 49(6): 139-146 DOI: | ||
Staggered Construction Technology for a TBM Assembly Cavern with Large Section in the Jinping Hydropower Station | ||
No.2 Engineering Co., Ltd., of China Railway 13th Bureau Group | ||
Received null Revised null | ||
Supporting info | ||
|