Staggered Construction Technology for a TBM Assembly Cavern with Large Section in the Jinping Hydropower Station
No.2 Engineering Co., Ltd., of China Railway 13th Bureau Group
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The design of the No.3 diversion tunnel of the Jinping II hydropower station involved the assembly of a TBM with a diameter of 12.4m. The staggered construction consequence, which divided into 4 layers with ten steps total, was adopted because of a large section and tight construction schedule. This method is characterized by advance crown exaction, a simulataneous pilot tunnel, parallel construction, and local advance excavation followed by immediate support. This paper introduces the application of this technique to the construction of the Jinping hydropower station.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
REN Guo-Qing
Keywords:   
Abstract: The design of the No.3 diversion tunnel of the Jinping II hydropower station involved the assembly of a TBM with a diameter of 12.4m. The staggered construction consequence, which divided into 4 layers with ten steps total, was adopted because of a large section and tight construction schedule. This method is characterized by advance crown exaction, a simulataneous pilot tunnel, parallel construction, and local advance excavation followed by immediate support. This paper introduces the application of this technique to the construction of the Jinping hydropower station.
Keywords:   
published: 2012-03-31
Cite this article:   
REN Guo-Qing .Staggered Construction Technology for a TBM Assembly Cavern with Large Section in the Jinping Hydropower Station[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(6): 139-146
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2012/V49/I6/139
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] HAN Yuxuan1 LENG Xiqiao2,3 YAN Jinxiu4 ZHANG Rui5.Construction Technology for the Shaft of Extra-long Micangshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 133-138
[3] KONG Qingxiang ZHAI Renfeng.Some Issues Concerning Construction of High Speed Railway Tunnels and Corresponding Countermeasures:A Case Study of Beitaizi Tunnel on the Beijing-Shengyang Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 166-171
[4] ZHOU Baosheng.Optimized CRD Construction Techniques for a Super-Shallow Bored Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 186-190
[5] AN Yonglin1 OUYANG Pengbo1 PENG Limin2 WU Bo3 HU Wenxuan1.Construction Techniques and Safety Analysis for a Deep Vertical Shaft and Vertical Shaft Shifting to Main Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 164-173
[6] Einar Broch.Tunnels and Underground Works for Hydropower Projects[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 1-12
[7] .Construction Techniques for a Shallow-Buried Tunnel with a Large Section in Hard Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(3): 190-194
[8] SONG Zhirong.Raise Construction Techniques for Inclined Ventilation Shaft of the Long, Deep- Buried Erlangshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(2): 202-206
[9] WU Quan-Li- 1, 2 Wang-Meng-Shu- 1 Zhu- Lei- 3 Dong-Xin-Ping- 3 Sun-Zheng-Yang- 4.Construction Technology for the Shield Tunnel Passing under the Existing Metro Line at the Launching End[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(4): 134-142
[10] ZHANG Yintao.Construction Techniques for and Cost Analysis of Secant Piles for the Pre-Reinforcement of Tunnels in Sand Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 195-201
[11] .Key Construction Techniques for Urban Underwater Bored Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(2): 9-16
[12] Zhou Wenbo.Discussion of the Application of Extra-Large Diameter EPB Shields
to Road Tunnels in Central Urban Areas
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(3): 1-7
[13] .Shield Launching within a Short Distance of an Operating Metro[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(1): 161-165
[14] TANG Xie-1, Li-Hai-Qing- 2, LIN Guo-Jin-1, Tian-Shang-Zhi-1.Key Techniques for the Design of the Gaoersi Extra-Long Single-Tube Tunnel on the Sichuan-Tibet Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(6): 108-115
[15] DU Wen.Analysis of the Surrounding Rock Deformation Mechanism of a Gently Inclined Sand and Mudstone Interbed in a Double-Track Railway Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(4): 22-25
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY