Abstract The design of the No.3 diversion tunnel of the Jinping II hydropower station involved the assembly of a TBM with a diameter of 12.4m. The staggered construction consequence, which divided into 4 layers with ten steps total, was adopted because of a large section and tight construction schedule. This method is characterized by advance crown exaction, a simulataneous pilot tunnel, parallel construction, and local advance excavation followed by immediate support. This paper introduces the application of this technique to the construction of the Jinping hydropower station.
Abstract:
The design of the No.3 diversion tunnel of the Jinping II hydropower station involved the assembly of a TBM with a diameter of 12.4m. The staggered construction consequence, which divided into 4 layers with ten steps total, was adopted because of a large section and tight construction schedule. This method is characterized by advance crown exaction, a simulataneous pilot tunnel, parallel construction, and local advance excavation followed by immediate support. This paper introduces the application of this technique to the construction of the Jinping hydropower station.
Keywords:
published: 2012-03-31
Cite this article:
REN Guo-Qing
.Staggered Construction Technology for a TBM Assembly Cavern with Large Section in the Jinping Hydropower Station[J] MODERN TUNNELLING TECHNOLOGY, 2012,V49(6): 139-146