|
2013, Vol. 50(1): 67-72 DOI: | ||
Numerical Analysis of the Scheme for the Portal Excavation of a Shallow Tunnel in a Grade IV Rock Mass | ||
1 State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology 2 School of Mechanics and Civil Engineering, China University of Mining and Technology | ||
Received null Revised null | ||
Supporting info | ||
|