|
2013, Vol. 50(3): 163-167 DOI: | ||
Analysis of and Countermeasures Against Gas Problems in the Queletage No.2 Tunnel on the New Special Railway from Kuqa to the Ehuobulake Coal Mine | ||
(Xinjiang Railway Survey and Design Institute, Urumqi 830011) | ||
Received null Revised null | ||
Supporting info | ||
|