|
2013, Vol. 50(4): 50-55 DOI: | ||
A Comparison of the Horizontal Sound Probing Method and the Tunnel Seismic Prediction Method | ||
(1 China Railway No.5 Engineering Group Co. Ltd., Changsha 410116; 2 China Railway Southwest Research Institute Co. Ltd., Chengdu 611731) |
||
Received null Revised null | ||
Supporting info | ||
|