|
2013, Vol. 50(4): 158-163 DOI: | ||
Construction Technique for a Mountain Tunnel Portal Without Slope Cutting in Steep Terrain | ||
(The 3rd Engineering Co. Ltd. of the China Railway 12th Bureau Group, Taiyuan 030024) | ||
Received null Revised null | ||
Supporting info | ||
|