Construction Technique for a Mountain Tunnel Portal
Without Slope Cutting in Steep Terrain
(The 3rd Engineering Co. Ltd. of the China Railway 12th Bureau Group, Taiyuan  030024)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The Fenghuangling tunnel, which is 5896.9m long, is the key project of the Xinzhou-Fuping Expressway in Shanxi province. In light of the steep terrain, the bases of the tunnel and retaining wall were consolidated against bias pressure by vertical grouting with small pipes in a quincunx pattern to enhance the bearing capacity of the ground, followed by the construction of a retaining wall base, the tunnel base, invert, protective reinforced concrete arch, concrete lining, and so on. Moreover, the three-bench seven-step method was applied and normal excavation was carried out after an advance of 15m, ensuring safe excavation of the tunnel entrance without slope cutting.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
KeywordsMountain tunnel   Bias pressure   Oblique crossing   Construction technique without slope cutting   Grouting reinforcement   Bench cut method     
Abstract: The Fenghuangling tunnel, which is 5896.9m long, is the key project of the Xinzhou-Fuping Expressway in Shanxi province. In light of the steep terrain, the bases of the tunnel and retaining wall were consolidated against bias pressure by vertical grouting with small pipes in a quincunx pattern to enhance the bearing capacity of the ground, followed by the construction of a retaining wall base, the tunnel base, invert, protective reinforced concrete arch, concrete lining, and so on. Moreover, the three-bench seven-step method was applied and normal excavation was carried out after an advance of 15m, ensuring safe excavation of the tunnel entrance without slope cutting.
KeywordsMountain tunnel,   Bias pressure,   Oblique crossing,   Construction technique without slope cutting,   Grouting reinforcement,   Bench cut method     
published: 2013-04-20
Cite this article:   
.Construction Technique for a Mountain Tunnel Portal
Without Slope Cutting in Steep Terrain[J]  MODERN TUNNELLING TECHNOLOGY, 2013,V50(4): 158-163
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2013/V50/I4/158
 
No references of article
[1] LI Youyun1 WANG Fengcang2 ZHANG Yuwei1 HU Kunkun1.Spatial Distribution Characteristics of the Full Displacement of Surrounding Rock of a Shallow-Buried Tunnel Section in Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(1): 114-123
[2] WANG Wei PAN Wenshuo BIAN Jiasheng GAO Lingtao.Optimization and Application of the Shallow-Buried Construction Method for an Urban Underground Road Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 209-216
[3] LI Guo-Liang.Construction Techniques for Large-Section Loess Tunnels of High-Speed Railways by Bench Method[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(5): 6-16
[4] YU Yuan-Quan-1, Liu-Xiao-Lin-2, Zhang-Xue-Fu-2.Comparison and Analysis of Temporary Support Schemes for the Middle Pilot Heading in a Multi-Arch Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(1): 138-143
[5] Zou Mingbo1 Zhang Wenxin.Discussion of Grouting Reinforcement Technology for the Collapsed Section
of the Huangjin Tunnel on the Newly-Built Ganzhou-Shaoguan Railway
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 176-182
[6] .Construction Techniques for a Large-Section Loess Railway Tunnel at the Dividing Line of Loess and Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(1): 139-142
[7] JI Xiao-Ming-1, TANG Wei-Cai-1, TAN Wen-2, WANG Bing-Hua-3.Study of Key Construction Technologies for Multiple Closely Spaced Tunnels in an Urban Area[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(6): 23-31
[8] ZHANG Xiu-Liang.Key Factors Affecting Bench Construction of a Tunnel in Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(4): 60-62
[9] HUANG Jia-Yi.Parameters Analysis and Application of Bench Method for High-speed Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(3): 77-82
[10] WANG Xin-Dong.Design and Construction of the Gaoqiao Tunnel on the Zhengzhou-Xi'an Passenger Dedicated Line Passing Under the Existing Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(1): 132-137
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY