Railway tunnel, Bench method, Parameters, Numerical model, Deformation of surrounding rock," /> Parameters Analysis and Application of Bench Method for High-speed Railway Tunnels
 
   Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2012, Vol. 49 Issue (3) :77-82    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Parameters Analysis and Application of Bench Method for High-speed Railway Tunnels
Guiyang-Guangzhou Railway Co., Ltd
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The bench method in tunnel construction is favored due to its good adaptability. It is necessary to take a further study on the reasonable selection of technical factors involved in bench method for large-section tunnel of high-speed railway. A three-dimensional numerical calculation model is established to analyzes the influence of factors on excavation stability and provide the theoretical support to the selections of bench length, bench height and flatness of upper section.
Service
Email this article Railway tunnel, Bench method, Parameters, Numerical model, Deformation of surrounding rock

”. Please open it by linking:" name=neirong>
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywordsfont-size: 10.5pt   mso-bidi-font-size: 11.0pt   mso-bidi-font-family: 'Times New Roman'   mso-font-kerning: 1.0pt   mso-ansi-language: EN-US   mso-fareast-language: ZH-CN   mso-bidi-language: AR-SA   Railway tunnel, Bench method, Parameters, Numerical model, Deformation of surrounding rock')" href="#">mso-fareast-font-family: 宋体" lang="EN-US">Railway tunnel, Bench method, Parameters, Numerical model, Deformation of surrounding rock     
Abstract: The bench method in tunnel construction is favored due to its good adaptability. It is necessary to take a further study on the reasonable selection of technical factors involved in bench method for large-section tunnel of high-speed railway. A three-dimensional numerical calculation model is established to analyzes the influence of factors on excavation stability and provide the theoretical support to the selections of bench length, bench height and flatness of upper section.
Keywordsfont-size: 10.5pt,   mso-bidi-font-size: 11.0pt,   mso-bidi-font-family: 'Times New Roman',   mso-font-kerning: 1.0pt,   mso-ansi-language: EN-US,   mso-fareast-language: ZH-CN,   mso-bidi-language: AR-SA,   Railway tunnel, Bench method, Parameters, Numerical model, Deformation of surrounding rock')" href="#">mso-fareast-font-family: 宋体" lang="EN-US">Railway tunnel, Bench method, Parameters, Numerical model, Deformation of surrounding rock     
Cite this article:   
.Parameters Analysis and Application of Bench Method for High-speed Railway Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(3): 77-82
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2012/V49/I3/77
 
No references of article
[1] YU Yang HONG Peng ZHU Chen ZHAO Xiushao.Analysis of the Fractal Structure of the Rock Mass Deformation of Deep-buried Hard Rock Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 124-129
[2] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[3] YANG Feng.Determination Method for a Reasonable Installation Time of the Tunnel′s Secondary Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 56-64
[4] LIU Xinrong1, 2 WANG Jiming1, 2 LI Dongliang1, 2 GUO Zihong1, 2.Three-Dimensional Model Test of Surrounding Rock Deformation of a New Tunnel Approaching an Existing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 171-179
[5] .Support Deformation Induced Clearance Invasion and Treatment for a Pelitic Soft-Rock Tunnel Passing through a Water-Rich Fault Zone[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(3): 181-189
[6] WANG Xin-Sheng- 1 Zuo-Wei-Qin- 2 Zhou-Cheng-Tao- 1 Chen- Yu- 1 Hou-Ya-Bin- 1.Deformation Prediction for Tunnel Surrounding Rock Based on the NonHomogeneous Exponential Function GM (1, 1) Model[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(1): 105-109
[7] WEN Sen1,2 LIU Yuhui2 YANG Shengqi1 HE Ziqi2.Rheological Deformation of Surrounding Rock of Circular Tunnel Based on the Hoek-Brown Criterion[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 63-67
[8] WANG Yiguo1 JI Anjun2.Accuracy and Influence Factors of the Verhulst Model for the Prediction of Surrounding Rock Deformation[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(5): 74-78
[9] Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
[10] Lin Xin1, Shu Heng1, Zhang Yaguo2, Yang Linsong1, Li Jin1, Guo Xiaohong1.Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 7-14
[11] Yao Zhanhu1, Yang Zhao2, Tian Yi1, Hu Huitao1.Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 15-23
[12] Li Xinyu, Zhang Dingli, Fang Qian, Song Haoran.On Water Burst Patterns in Underwater Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 24-31
[13] Shu Heng, Wu Shuyuan, Li Jian, Guo Xiaohong.Health Monitoring Design for Extra-Large Diameter Underwater Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 32-40
[14] Liu Guangfeng1, Chen Fangwei2, Zhou Zhi1, Zhang Shilong3, Liu Mingqiang1.Identification of Investment Risks for River-Crossing Tunnels Based on Grey Fuzzy Multi-Attribute Group Decision Making[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 41-48
[15] Yao Zhanhu.Construction Risk Assessment for the Shield-Driven Section of the Nanjing Weisan Road River-Crossing Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 49-54
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY