|
2013, Vol. 50(4): 170-175 DOI: | ||
Cause Analysis and Treatment Principles for Tunnel Lining Cracking in Sandy Mudstone with High Geostress | ||
(1 Lanzhou-Chongqing Railway Co. Ltd., Lanzhou 730050; 2 China Railway Eryuan Engineering Group Co. Ltd., Chengdu 610031) |
||
Received null Revised null | ||
Supporting info | ||
|