|
2013, Vol. 50(4): 188-196 DOI: | ||
Construction Ventilation Scheme for the Huayingshan Extra-Long Tunnel on the Nanchong-Dazhu-Liangping Expressway | ||
(1 Nanchong-Chongqing Expressway Co. Ltd., Nanchong 637000; 2 Key Laboratory of Transportation Tunnel Engineering, Southwest Jiaotong University, Chengdu 610031) |
||
Received null Revised null | ||
Supporting info | ||
|