|
2013, Vol. 50(4): 197-202 DOI: | ||
On the Application of Explosion-Proof Modification Technology for Construction Machinery and Vehicles for the Gas-Rich Huayingshan Tunnel on the Nanchong-Dazhu-Liangping Expressway | ||
(1 Sichuan Communication Engineering Quality Supervision Bureau, Chengdu 610041; 2 Sichuan Nanchong-Chongqing Expressway Co. Ltd., Nanchong 637000) |
||
Received null Revised null | ||
Supporting info | ||
|