2014, Vol. 51(1): 97-104 DOI: | ||
Numerical Simulation of the Rockburst Mechanism in the Meihuashan Tunnel | ||
(1 China Railway No.5 Engineering Group Co. Ltd, Guiyang 364000; 2 School of Engineering and Technology, China University of Geosciences, Beijing 100083; 3 The First Monitoring Center Institute of Crustal Dynamics, The Institute of Crustal Dynamics, Tianjin 300180) | ||
Received null Revised null | ||