现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2014, Vol. 51(2): 63-69    DOI:
The Calculation of Soil Settlement Induced by Construction of Twin Parallel Shield Tunnels with a Small-Interval
(1 Yiwu Industrial and Commercial College, Yiwu 322000; 2 Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn