The Calculation of Soil Settlement Induced by Construction of Twin Parallel Shield Tunnels with a Small-Interval
(1 Yiwu Industrial and Commercial College, Yiwu 322000; 2 Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract This paper presents that the curve of soil settlement induced by small-interval double-bore parallel shield tunnel construction conforms with the normal distribution, and summarizes the calculation method for surface settlement. Aiming at the deficiencies of various calculation methods, the modified 2D Peck formula is established to calculate the deep soil settlement while considering the asymmetry of the settlement curve. Based on the research of calculation parameters, the measured results show that iTotal / iAdvancing tunnel (i: width coefficient of the settlement trough) decreases linearly with the increase of h/D, thus giving the formula for iTotal and ηTotal (η : Soil loss rate). Additionally, this paper firstly proposes the coefficient C of relative horizontal distance between two tunnel axes (C<0.6; C=L/(h+R)), to which the shape of the total ground settlement curve is related. According to the case study, the predicted values agree with the measured ones and the calculation is relatively simple.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WU Hua-Jun-1
Wei
GANG 2
KeywordsDouble-bore parallel shield tunnel construction   Soil settlement   Calculation method     
Abstract: This paper presents that the curve of soil settlement induced by small-interval double-bore parallel shield tunnel construction conforms with the normal distribution, and summarizes the calculation method for surface settlement. Aiming at the deficiencies of various calculation methods, the modified 2D Peck formula is established to calculate the deep soil settlement while considering the asymmetry of the settlement curve. Based on the research of calculation parameters, the measured results show that iTotal / iAdvancing tunnel (i: width coefficient of the settlement trough) decreases linearly with the increase of h/D, thus giving the formula for iTotal and ηTotal (η : Soil loss rate). Additionally, this paper firstly proposes the coefficient C of relative horizontal distance between two tunnel axes (C<0.6; C=L/(h+R)), to which the shape of the total ground settlement curve is related. According to the case study, the predicted values agree with the measured ones and the calculation is relatively simple.
KeywordsDouble-bore parallel shield tunnel construction,   Soil settlement,   Calculation method     
published: 2013-07-16
Cite this article:   
WU Hua-Jun-1, Wei, GANG 2 .The Calculation of Soil Settlement Induced by Construction of Twin Parallel Shield Tunnels with a Small-Interval[J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(2): 63-69
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2014/V51/I2/63
 
No references of article
[1] QI Jun1 WANG Zhongjie2,3,4 CHEN Zijun1 LIN Cungang2,3,4 XIE Wenjiang1 LIANG Yu2,3,4.Analysis of the Parameter Values for Settlement Trough Width Induced by Shield Tunnel Excavation in Deep Soil[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 29-41
[2] CUI Guangyao1 DAI Aimeng1 MA Jianfei2 NING Maoquan3.Study on Calculation Method and Influencing Factors of Carbon Emission during Construction of Rectangular Pipe-jacking Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 126-134
[3] GUO Chun1,2 GUO Yalin1,2 CHEN Zheng1,2.Carbon Emission Accounting and Research Progress Analysis of Traffic Tunnel Engineering[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 1-10
[4] WANG Ling1 ZHONG Jiuqiang2,3 ZHU Bitang2,3.Numerical Analysis on Ground Settlement Induced by Shield Tunnelling with Adjacent End Shaft Works[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 124-132
[5] .Calculation Method and Engineering Application of Drawdown Induced by Tunnel Water Leakage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 86-92
[6] WANG Zhilong1,2 ZHOU Renqiang3 YANG Nie1,2 WANG Mingnian1,2 LIU Dagang1,2.Hoek-Brown Criterion Based Calculation Method of Rock Resistant Coefficient in Tunnelling and Its Engineering Application[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 84-90
[7] JIANG Yongtao1 WANG Mingnian1 ZHANG Yiteng1 YU Li1 JIANG Fan2 XIAO Zerong3.Prediction Method for Surface Settlement in Tunnel Construction with Pipe Curtain Support[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 82-90
[8] WANG Jialei JI Xinbo.Comparative Analysis of Calculation Methods for Jacking Force of Jacking Pipes[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(6): 11-18
[9] YU Cheng-Shuo-1, 2 , DING Wen-Qi-1, 2 , ZHANG Qing-Zhao-1, 2 .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 11-18
[10] QIU Mingming1 YANG Guolin1 WU Zhenqing2 JIANG Anlong3 LIN Yuliang1.Distribution Laws of Surface Settlement Induced by Shield Construction of Twin-Tube Metro Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(2): 96-105
[11] LI Xiao-Lin- 1, 2 Tao-Lian-Jin- 1 Guo- Ting- 2 Hui-Li-Ping.Practical Calculation Method for the Construction of Parallel Shield Tunnels with Small Spacing[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(5): 161-167
[12] Hu Yunhua1 Zhang jianmin2 Zhengshaohua1.Discussion of a Practical Calculation Method for the Maximum Support Pressure of Slurry Shield Tunnels in Sand Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 158-164
[13] Wang Chunhao.Calculation Method for Surrounding Rock Pressure of a Loess Highway Tunnel with an Extra-Large Section[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(3): 175-181
[14] ZHANG Sheng.Discussion on Insulation Design for Tunnels in High-altitude
and Severe Cold Region and Thermal Calculation Method
[J]. MODERN TUNNELLING TECHNOLOGY, 2011,48(3): 59-63