|
2015, Vol. 52(1): 136-142 DOI: | ||
Prediction and Control Techniques for Building Settlement Induced by Large-Diameter EPB Shield Tunnelling | ||
(1 School of Civil Engineering, Beijing Jiaotong University, Beijing 100044;2 Beijing Municipal Group, Beijing 100045;
3 Beijing Metro Construction Administration Co. Ltd., Beijing 100037) |
||
Received null Revised null | ||
Supporting info | ||
|