|
2015, Vol. 52(3): 193-199 DOI: | ||
A Study of the Construction Sequences of a Large-Section Shallow-Buried Unsymmetrical Loading Tunnel by the CRD Method | ||
(School of Civil Engineering, Central South University, Changsha 410075) | ||
Received null Revised null | ||
Supporting info | ||
|