现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2015, Vol. 52(3): 193-199    DOI:
A Study of the Construction Sequences of a Large-Section Shallow-Buried Unsymmetrical Loading Tunnel by the CRD Method
(School of Civil Engineering, Central South University, Changsha 410075)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn