|
2015, Vol. 52(4): 158-164 DOI: | ||
Discussion of a Practical Calculation Method for the Maximum Support Pressure of Slurry Shield Tunnels in Sand Strata | ||
(1 CCCC Second Highway Consultants Co.Ltd., Wuhan 430056; 2 CCCC Nanjing Weisan Rd. River-Crossing Tunnel Construction Headquarters, Nanjing 211800) | ||
Received null Revised null | ||
Supporting info | ||
|