|
2015, Vol. 52(6): 126-134 DOI: | ||
On the Failure Mechanism and Reinforcement Techniques for Open-Cut Sections of High-Speed Railway Tunnels | ||
1. Department of Architectural Engineering, Xuancheng Campus, Hefei University of Technology 2. Faculty of Engineering, China University of Geosciences 3. College of Civil Engineering, Hunan City University | ||
Received null Revised null | ||
Supporting info | ||
|