|
2016, Vol. 53(2): 101-106 DOI: | ||
Influence of the Transient Pressure in a Tunnel on the Speed Increase of Existing Passenger Railway Lines | ||
(Department of Maintenance and Repairing, Chengdu Railway Bureau, Chengdu 610081) | ||
Received null Revised null | ||
Supporting info | ||
|