现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2016, Vol. 53(4): 29-36    DOI:
Geostress Measurement and 3D Multivariate Regression An Geostress Field of the Liangshui Tunnel
(1 School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou 730070; 2 China Railway First Survey & Design Institute GroupCo. Ltd., Xi′an 710043; 3 School of Civil Engineering, Northwest University for Nationalities, Lanzhou 730030; 4 Changjiang River Scientific Research Institute, Wuhan 430010)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn