|
2017, Vol. 54(3): 1-7 DOI: | ||
On Design Issues of Reinforcement of the Secondary Lining of High-Speed Railway Tunnel | ||
(1 China Railway Eryuan Engineering Group Co. Ltd., Chengdu 610031; 2 Beijing Jiaotong University, Beijing 100044) | ||
Received null Revised null | ||
Supporting info | ||
|