现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2017, Vol. 54(3): 148-154    DOI:
Efficiency of Rock Breaking by TBM Cutters in a Joint Rock Mass with Different Confining Pressures
(1 School of Civil Engineering and Architecture, Henan University, Kaifeng 475004; 2 State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology, Xuzhou, 221116)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn