|
2017, Vol. 54(5): 138-145 DOI: | ||
Failure Characteristics and Mechanical Mechanism of Deeply-Buried Tunnels with High External Water Pressure for Drill &Blast and TBM Methods | ||
(1 State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology,Chengdu 610059;2 Huadong Engineering Corporation Limited, PowerChina ,Hangzhou 310014) | ||
Received null Revised null | ||
Supporting info | ||
|