|
2018, Vol. 55(1): 184-193 DOI: | ||
Disturbance Mechanism of Deep-Hole Grouting for Shallow Metro Tunnels in Water-Rich Sand Layers | ||
(1 Jinan Rail Transit Group Co. Ltd., Jinan 250101; 2 CCCC Highway Consultants Co. Ltd. (HPDI), Beijing 100088; 3 School of Environmental Science and Engineering, Ocean University of China, Qingdao 266100; 4 Shandong Provincial Key Laboratory of Marine Environment and Geological Engineering, Qingdao 266100) | ||
Received null Revised null | ||
Supporting info | ||
|