|
2018, Vol. 55(3): 176-185 DOI: | ||
Optimization of the Construction Scheme for a PBA Metro Station Adjacent to an Existing Metro Tunnel | ||
(1 Beijing Municipal Engineering Research Institute, Beijing 100037; 2 Tunnel and Underground Engineering Research Center of Ministry of Education, Beijing Jiaotong University, Beijing 100044) | ||
Received null Revised null | ||
Supporting info | ||
|