| 
  
MODERN TUNNELLING TECHNOLOGY   2018, Vol. 55   Issue (3) :176-185    DOI:                                                                                                      | 
  
      
  | 
  ||||
| Optimization of the Construction Scheme for a PBA Metro Station Adjacent to an Existing Metro Tunnel | ||||
| (1 Beijing Municipal Engineering Research Institute, Beijing 100037; 2 Tunnel and Underground Engineering Research Center of Ministry of Education, Beijing Jiaotong University, Beijing 100044) | ||||
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY 
      |