|
2018, Vol. 55(4): 132-138 DOI: | ||
Load-Bearing Stages of Joint Shear Keys and Settlement Control Standards of Immersed Tunnel Elegments | ||
(1 School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang 050043; 2 School of Highway, Chang′an University, Xi′an 710064; 3 The Key Laboratory for Health Monitoring and Control of Large Structures, Shijiazhuang 050043; 4 Power China Huadong Engineering Co. Ltd., Hangzhou 311122) | ||
Received null Revised null | ||
Supporting info | ||
|