|
2019, Vol. 56(3): 166-171 DOI: | ||
Some Issues Concerning Construction of High Speed Railway Tunnels and Corresponding Countermeasures:A Case Study of Beitaizi Tunnel on the Beijing-Shengyang Railway | ||
(China Railway First Group Co., Ltd., Xi′an 710054) | ||
Received null Revised null | ||
Supporting info | ||
|