[an error occurred while processing this directive]
现代隧道技术
Home
|
About Journal
|
Editorial Board
|
|
Instruction
|
Subscription
|
Advertisement
|
|
Download
|
中文
Office Online
Search
Adv Search
现代隧道技术
·
Online Submission
·
Manuscript Tracking
·
Peer Review
·
Editor Work
·
Office Work
·
Editor-in-chief
Journal Online
·
Forthcoming Articles
·
Current Issue
·
Next Issue
·
Archive
·
Advanced Search
·
Read Articles
·
Download Articles
·
Email Alert
·
Download
·
More
>>
Quick Search
Advanced Search
MODERN TUNNELLING TECHNOLOGY
2012 Vol.49 Issue.2
Published 2012-04-25
Article
21
Shield Construction Risks and Quality Control Measures for Lot 2222 of the Shenzhen Metro Line 2
DENG Bin-1, GU Xiao-Fang-2
Shield technology was adopted for the construction of the tunnel section connecting the Qiaoxiang, Xiangmi, and North Xiangmei Stations of Lot 2222. Completed on September 10, 2010, this project required overcoming the difficulties of hard rock, rock consisting of a soft upper stratum and hard lower stratum, the under-passing of existing buildings, and passing a mined tunnel during its construction. Focused on the key points of construction risks and quality control, this paper presents the concrete requirements for the two running tunnels in this lot in terms of construction management as well as the results achieved.
2012 Vol. 49 (2): 21-27 [
Abstract
] (
3177
) [
HTML
1KB] [
PDF
0KB] (
692
)
MODERN TUNNELLING TECHNOLOGY
More>>
·
·
More>>
Copyright © 2011 Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:
Beijing Magtech Co.ltd
Email:
support@magtech.com.cn