现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
现代隧道技术
·Online Submission
·Manuscript Tracking
·Peer Review
·Editor Work
·Office Work
·Editor-in-chief
 Journal Online
·Forthcoming Articles
·Current Issue
·Next Issue
·Archive
·Advanced Search
·Read Articles
·Download Articles
·Email Alert
·
 Download
·
More>>  
 
 
2016 Vol.53 Issue.1,Published 25 February 2016

Article
1 BIM Based 3D Visual Construction Management System for Shield Tunnelling
YU Gang1,2, HU Min1,2, GAO Xinwen2,3, CHEN Lisheng4, ZHAO Guoqiang4
2016 Vol. 53 (1): 1-5 [Abstract] ( 1804 ) [HTML 1KB] [ PDF 3450KB] ( 2833 )
6 BIM Based 3D Design Technologies for Railway Tunnels
2016 Vol. 53 (1): 6-10 [Abstract] ( 1455 ) [HTML 1KB] [ PDF 3694KB] ( 2559 )
11 Development of 3D Virtual Display Software for Railway Tunnel Defects
2016 Vol. 53 (1): 11-16 [Abstract] ( 1407 ) [HTML 1KB] [ PDF 3457KB] ( 2010 )
17 On Nondestructive Testing for Cavities in Immersed Tunnel Foundations by the Sand-Flow Method
2016 Vol. 53 (1): 17-22 [Abstract] ( 1339 ) [HTML 1KB] [ PDF 3830KB] ( 2098 )
23 On the Energy-Saving Mode for Highway Tunnels
2016 Vol. 53 (1): 23-27 [Abstract] ( 1684 ) [HTML 1KB] [ PDF 2034KB] ( 2878 )
28 Experimental Research on Corrosion and Leaching Characteristics of Gypsum Rock Surrounding Tunnels
2016 Vol. 53 (1): 28-37 [Abstract] ( 1334 ) [HTML 1KB] [ PDF 4111KB] ( 2180 )
38 A Combined Prediction Method for Rock Bursts Based on a Data Fusion Algorithm
2016 Vol. 53 (1): 38-44 [Abstract] ( 1273 ) [HTML 1KB] [ PDF 1793KB] ( 2008 )
45 Internal Forces Solution for a Deep-Buried Shield Tunnel under the Action of a Seismic Wave
2016 Vol. 53 (1): 45-51 [Abstract] ( 1379 ) [HTML 1KB] [ PDF 2639KB] ( 2073 )
52 Analysis of the Seismic Damage Rule Based on the Distance between the Tunnel and the Fractured Fault Zone
2016 Vol. 53 (1): 52-61 [Abstract] ( 1677 ) [HTML 1KB] [ PDF 4782KB] ( 2984 )
62 Influence of Penetration on the Rock-Breaking Efficiency of a TBM Cutter
2016 Vol. 53 (1): 62-68 [Abstract] ( 1295 ) [HTML 1KB] [ PDF 3623KB] ( 2212 )
69 An Analysis of the Temperature Field of a TBM Disc Cutter during Rock Breaking
2016 Vol. 53 (1): 69-74 [Abstract] ( 1260 ) [HTML 1KB] [ PDF 3015KB] ( 2146 )
75 Study of the Zones Influenced by the Construction of Metro Running Tunnels Approaching Existing Buildings
2016 Vol. 53 (1): 75-82 [Abstract] ( 1274 ) [HTML 1KB] [ PDF 3222KB] ( 2192 )
83 Safety Evaluation of Flexible Pipelines during Metro Construction
2016 Vol. 53 (1): 83-89 [Abstract] ( 1306 ) [HTML 1KB] [ PDF 2209KB] ( 2065 )
90 On the Limit Support Force on a Working Face under Active Failure: Case Study of a Shield-Driven Tunnel in a Water-Rich Sandy Stratum
2016 Vol. 53 (1): 90-95 [Abstract] ( 1278 ) [HTML 1KB] [ PDF 3325KB] ( 2285 )
96 Analysis of the Force Applied on the Support Structure in a High-Geostress Tunnel Constructed by the Three-Bench Seven-Step Method
2016 Vol. 53 (1): 96-102 [Abstract] ( 1280 ) [HTML 1KB] [ PDF 4462KB] ( 2287 )
103 Mechanical Analysis of Double-Decked Traffic Lane Slabs in Shield Tunnels
2016 Vol. 53 (1): 103-110 [Abstract] ( 1291 ) [HTML 1KB] [ PDF 5657KB] ( 2178 )
111 A Study on the Natural Wind Calculation Method and Energy Conservation in Extra-Long Highway Tunnels
2016 Vol. 53 (1): 111-118 [Abstract] ( 1289 ) [HTML 1KB] [ PDF 4014KB] ( 2151 )
119 Theoretical Calculation Method for the Horizontal Bearing Capacity of Belled Wedge Piles
2016 Vol. 53 (1): 119-126 [Abstract] ( 1303 ) [HTML 1KB] [ PDF 3841KB] ( 1880 )
127 Civil Engineering Design for the Haicang Subsea Tunnel, the Second Western Passage in Xiamen
2016 Vol. 53 (1): 127-133 [Abstract] ( 1384 ) [HTML 1KB] [ PDF 4759KB] ( 2446 )
134 Scheme Design and Safety Analysis for the U-Turn of a Combined TBM in a Subway Tunnel
2016 Vol. 53 (1): 134-140 [Abstract] ( 1433 ) [HTML 1KB] [ PDF 4361KB] ( 2162 )
141 Design and Innovation of Underground Ventilation Rooms in Super-Long Highway Tunnels
2016 Vol. 53 (1): 141-146 [Abstract] ( 1282 ) [HTML 1KB] [ PDF 4269KB] ( 2270 )
147 Active Cutter Replacement Techniques for EPB Shield Tunnelling in a Waterless Sandy Cobble Stratum
2016 Vol. 53 (1): 147-152 [Abstract] ( 1227 ) [HTML 1KB] [ PDF 2475KB] ( 2263 )
153 Soil Conditioning Technology for Shield Tunnelling in a Water-Rich Sandy Stratum
2016 Vol. 53 (1): 153-158 [Abstract] ( 1315 ) [HTML 1KB] [ PDF 4044KB] ( 2322 )
159 Characteristics of Existing Station Deformation Induced by the Approaching Construction of a New Underlying Shield Tunnel
2016 Vol. 53 (1): 159-164 [Abstract] ( 1244 ) [HTML 1KB] [ PDF 4625KB] ( 2081 )
165 Construction Technology and Environmental Impact Prediction for a Shield Tunnel under a Viaduct Pile Foundation Group
2016 Vol. 53 (1): 165-172 [Abstract] ( 1241 ) [HTML 1KB] [ PDF 3874KB] ( 2418 )
173 Monitoring and Analysis of the Impact of Adjacent Bridge Pile Construction on Subway Tunnels
2016 Vol. 53 (1): 173-179 [Abstract] ( 1296 ) [HTML 1KB] [ PDF 4793KB] ( 2369 )
180 Surface Subsidence Control of a Tianjin Metro Shield Tunnel Passing under a Parking Apron
2016 Vol. 53 (1): 180-186 [Abstract] ( 1214 ) [HTML 1KB] [ PDF 2970KB] ( 1996 )
187 On the Application of Ground Penetrating Radar for Quality Detection of Tunnel Linings in Cold Regions
2016 Vol. 53 (1): 187-191 [Abstract] ( 1211 ) [HTML 1KB] [ PDF 2312KB] ( 1967 )
192 Design and Construction of the Waterproofing and Drainage System for the Jianshan Tunnel on the Shanghai-Kunming PDL
2016 Vol. 53 (1): 192-195 [Abstract] ( 1340 ) [HTML 1KB] [ PDF 2317KB] ( 2200 )
196 Cause Analysis and Treatment of Water Seepage and Freezing in a Highway Tunnel in a High-Altitude Frigid Area
2016 Vol. 53 (1): 196-201 [Abstract] ( 1310 ) [HTML 1KB] [ PDF 3710KB] ( 2533 )
MODERN TUNNELLING TECHNOLOGY
More>>  
·
·
More>> 
 
 
 
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn