现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
现代隧道技术
·Online Submission
·Manuscript Tracking
·Peer Review
·Editor Work
·Office Work
·Editor-in-chief
 Journal Online
·Forthcoming Articles
·Current Issue
·Next Issue
·Archive
·Advanced Search
·Read Articles
·Download Articles
·Email Alert
·
 Download
·
More>>  
 
 
2016 Vol.53 Issue.1,Published 25 February 2016

Article
1 BIM Based 3D Visual Construction Management System for Shield Tunnelling
YU Gang1,2, HU Min1,2, GAO Xinwen2,3, CHEN Lisheng4, ZHAO Guoqiang4
2016 Vol. 53 (1): 1-5 [Abstract] ( 1595 ) [HTML 1KB] [ PDF 3450KB] ( 2292 )
6 BIM Based 3D Design Technologies for Railway Tunnels
2016 Vol. 53 (1): 6-10 [Abstract] ( 1284 ) [HTML 1KB] [ PDF 3694KB] ( 2104 )
11 Development of 3D Virtual Display Software for Railway Tunnel Defects
2016 Vol. 53 (1): 11-16 [Abstract] ( 1267 ) [HTML 1KB] [ PDF 3457KB] ( 1663 )
17 On Nondestructive Testing for Cavities in Immersed Tunnel Foundations by the Sand-Flow Method
2016 Vol. 53 (1): 17-22 [Abstract] ( 1167 ) [HTML 1KB] [ PDF 3830KB] ( 1726 )
23 On the Energy-Saving Mode for Highway Tunnels
2016 Vol. 53 (1): 23-27 [Abstract] ( 1485 ) [HTML 1KB] [ PDF 2034KB] ( 2495 )
28 Experimental Research on Corrosion and Leaching Characteristics of Gypsum Rock Surrounding Tunnels
2016 Vol. 53 (1): 28-37 [Abstract] ( 1154 ) [HTML 1KB] [ PDF 4111KB] ( 1826 )
38 A Combined Prediction Method for Rock Bursts Based on a Data Fusion Algorithm
2016 Vol. 53 (1): 38-44 [Abstract] ( 1155 ) [HTML 1KB] [ PDF 1793KB] ( 1635 )
45 Internal Forces Solution for a Deep-Buried Shield Tunnel under the Action of a Seismic Wave
2016 Vol. 53 (1): 45-51 [Abstract] ( 1217 ) [HTML 1KB] [ PDF 2639KB] ( 1699 )
52 Analysis of the Seismic Damage Rule Based on the Distance between the Tunnel and the Fractured Fault Zone
2016 Vol. 53 (1): 52-61 [Abstract] ( 1485 ) [HTML 1KB] [ PDF 4782KB] ( 2621 )
62 Influence of Penetration on the Rock-Breaking Efficiency of a TBM Cutter
2016 Vol. 53 (1): 62-68 [Abstract] ( 1167 ) [HTML 1KB] [ PDF 3623KB] ( 1800 )
69 An Analysis of the Temperature Field of a TBM Disc Cutter during Rock Breaking
2016 Vol. 53 (1): 69-74 [Abstract] ( 1117 ) [HTML 1KB] [ PDF 3015KB] ( 1815 )
75 Study of the Zones Influenced by the Construction of Metro Running Tunnels Approaching Existing Buildings
2016 Vol. 53 (1): 75-82 [Abstract] ( 1096 ) [HTML 1KB] [ PDF 3222KB] ( 1808 )
83 Safety Evaluation of Flexible Pipelines during Metro Construction
2016 Vol. 53 (1): 83-89 [Abstract] ( 1113 ) [HTML 1KB] [ PDF 2209KB] ( 1761 )
90 On the Limit Support Force on a Working Face under Active Failure: Case Study of a Shield-Driven Tunnel in a Water-Rich Sandy Stratum
2016 Vol. 53 (1): 90-95 [Abstract] ( 1137 ) [HTML 1KB] [ PDF 3325KB] ( 1878 )
96 Analysis of the Force Applied on the Support Structure in a High-Geostress Tunnel Constructed by the Three-Bench Seven-Step Method
2016 Vol. 53 (1): 96-102 [Abstract] ( 1112 ) [HTML 1KB] [ PDF 4462KB] ( 1854 )
103 Mechanical Analysis of Double-Decked Traffic Lane Slabs in Shield Tunnels
2016 Vol. 53 (1): 103-110 [Abstract] ( 1130 ) [HTML 1KB] [ PDF 5657KB] ( 1739 )
111 A Study on the Natural Wind Calculation Method and Energy Conservation in Extra-Long Highway Tunnels
2016 Vol. 53 (1): 111-118 [Abstract] ( 1143 ) [HTML 1KB] [ PDF 4014KB] ( 1773 )
119 Theoretical Calculation Method for the Horizontal Bearing Capacity of Belled Wedge Piles
2016 Vol. 53 (1): 119-126 [Abstract] ( 1160 ) [HTML 1KB] [ PDF 3841KB] ( 1549 )
127 Civil Engineering Design for the Haicang Subsea Tunnel, the Second Western Passage in Xiamen
2016 Vol. 53 (1): 127-133 [Abstract] ( 1250 ) [HTML 1KB] [ PDF 4759KB] ( 1886 )
134 Scheme Design and Safety Analysis for the U-Turn of a Combined TBM in a Subway Tunnel
2016 Vol. 53 (1): 134-140 [Abstract] ( 1290 ) [HTML 1KB] [ PDF 4361KB] ( 1602 )
141 Design and Innovation of Underground Ventilation Rooms in Super-Long Highway Tunnels
2016 Vol. 53 (1): 141-146 [Abstract] ( 1119 ) [HTML 1KB] [ PDF 4269KB] ( 1873 )
147 Active Cutter Replacement Techniques for EPB Shield Tunnelling in a Waterless Sandy Cobble Stratum
2016 Vol. 53 (1): 147-152 [Abstract] ( 1104 ) [HTML 1KB] [ PDF 2475KB] ( 1870 )
153 Soil Conditioning Technology for Shield Tunnelling in a Water-Rich Sandy Stratum
2016 Vol. 53 (1): 153-158 [Abstract] ( 1182 ) [HTML 1KB] [ PDF 4044KB] ( 1949 )
159 Characteristics of Existing Station Deformation Induced by the Approaching Construction of a New Underlying Shield Tunnel
2016 Vol. 53 (1): 159-164 [Abstract] ( 1113 ) [HTML 1KB] [ PDF 4625KB] ( 1533 )
165 Construction Technology and Environmental Impact Prediction for a Shield Tunnel under a Viaduct Pile Foundation Group
2016 Vol. 53 (1): 165-172 [Abstract] ( 1102 ) [HTML 1KB] [ PDF 3874KB] ( 1763 )
173 Monitoring and Analysis of the Impact of Adjacent Bridge Pile Construction on Subway Tunnels
2016 Vol. 53 (1): 173-179 [Abstract] ( 1147 ) [HTML 1KB] [ PDF 4793KB] ( 1807 )
180 Surface Subsidence Control of a Tianjin Metro Shield Tunnel Passing under a Parking Apron
2016 Vol. 53 (1): 180-186 [Abstract] ( 1077 ) [HTML 1KB] [ PDF 2970KB] ( 1619 )
187 On the Application of Ground Penetrating Radar for Quality Detection of Tunnel Linings in Cold Regions
2016 Vol. 53 (1): 187-191 [Abstract] ( 1088 ) [HTML 1KB] [ PDF 2312KB] ( 1653 )
192 Design and Construction of the Waterproofing and Drainage System for the Jianshan Tunnel on the Shanghai-Kunming PDL
2016 Vol. 53 (1): 192-195 [Abstract] ( 1165 ) [HTML 1KB] [ PDF 2317KB] ( 1774 )
196 Cause Analysis and Treatment of Water Seepage and Freezing in a Highway Tunnel in a High-Altitude Frigid Area
2016 Vol. 53 (1): 196-201 [Abstract] ( 1176 ) [HTML 1KB] [ PDF 3710KB] ( 2047 )
MODERN TUNNELLING TECHNOLOGY
More>>  
·
·
More>> 
 
 
 
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn